Dura Skrim Reinforced Radon Barrier
/in Radon Barrier/by Darren
Site : St Joseph’s and St Ita’s, School, Tralee
Main Contractor : JF Flynn Construction Ltd.
Status: Under construction
Products Used :Dura Skrim 15WW Reinforced Radon Barrier
Comment : Installed a Reinforced Barrier to the footprint of the new Woodwork Room at St Joseph’s and St Ita’s School in Tralee on the 8th March, one day later and the external blockwork walls are underway along with laying out the underfloor insulation.
GCP GGM400 Radon Barrier Installation
/in Radon Barrier, Tanking membrane/by DarrenSite : Advanced Technology Building, Shannon Free Zone, Shannon
Main Contractor : K&J Townmore Ltd
Status : Complete
Products Used : GCP GGM400 Radon / Methane / CO2 Barrier, GCP Liquid Membrane, Preprufe and Bituthene to Lift Pit
Comment : This was a site with in filled ground therefore required the Methane / CO2 Barrier – note the extra detailing around pile caps with Liquid Membrane
Facebook Feed
3 days ago
7 months ago
7 months ago
7 months ago
Latest News
- Example of Poor Radon Barrier Installation17th April 2024 - 10:14 am
- Juta GP4 Reinforced Radon Barrier8th September 2023 - 10:52 am
- RMB400 Radon Barrier Installation18th July 2023 - 3:58 pm