GCP GGM400 Radon Barrier Installation
Site : Advanced Technology Building, Shannon Free Zone, Shannon
Main Contractor : K&J Townmore Ltd
Status : Complete
Products Used : GCP GGM400 Radon / Methane / CO2 Barrier, GCP Liquid Membrane, Preprufe and Bituthene to Lift Pit
Comment : This was a site with in filled ground therefore required the Methane / CO2 Barrier – note the extra detailing around pile caps with Liquid Membrane