GCP GGM400 Radon Barrier Installation

Site : Advanced Technology Building, Shannon Free Zone, Shannon

Main Contractor : K&J Townmore Ltd

Status : Complete

Products Used : GCP GGM400 Radon / Methane / CO2 Barrier, GCP Liquid Membrane, Preprufe and Bituthene to Lift Pit

Comment : This was a site with in filled ground therefore required the Methane / CO2 Barrier – note the extra detailing around pile caps with Liquid Membrane

 

RMB400 Reinforced Radon Barrier Installation

Site : Clondalkin, Dublin

Main Contractor : Careys Building & Civil Engineering

Status: On going Housing development

Products Used : RMB4OO Monarflex Reinforced Radon Barrier

Comment : note the extra detailing required when all the internal walls are raised above backfill

Waterproofing to a double lift pit

 

 

 

 

 

 

Picture 278 Picture 277 Picture 276

Site : New ITT Sports Academy Building, Tralee, Co Kerry

 

Main Contractor : Eamon Costello (Kerry) Ltd

 

Status : first day on the job

 

Products Used : Preprufe 300r Waterproof Membrane

 

Comment : Waterproofing to a double lift pit

 

Various Locations in Munster

Site: Various Locations in Munster

Status: Complete

Products Used: Duraskrim Reinforced Radon Barrier and Ancillary Products

Comment: Some of the smaller and more complex applications.

IMG_0851IMAG0316

 

 

Cork City North West Primary Care Centre

Site: Cork City North West Primary Care Centre

Status: 90% Complete

Products Used: Monarflex RMB400,  MRX Self Adhesive Membrane and Ancillary Products

Comment: Typical Installation with a large Quantity of Pop Ups and Columns