Monaflex RMB400 Reinforced Radon Barrier

Materials: Monarflex RMB 400 radon barrier installed to new extension in Bruff for MH Construction. Note how it is sealed to existing walls using Monarflex MRX self adhesive membrane

Status: Completed

Rapid Build Project – Supply and Installation of a Memtec M1 Radon / Methane / Carbon Dioxide Membrane

As you all know construction work was shut down as per regulations during the lockdown except for essential projects which included 2no 24 bedroom units in the University Hospital Limerick and Croom Hospital. We at Southwest Radon are proud to be part of this project on behalf off Clancy Construction @ClancyConstruction(main contractor) and cannot praise everyone involved for the hard work and long hours put in to ensure these rapid build projects are completed the highest standard

Project: 2no 24 bedroom units in the University Hospital Limerick and Croom Hospital.

Materials: Memtec M1 Radon / Methane / Carbon Dioxide Membrane

Status: Ongoing

For the Supply and Installation of a Siga System Vapour Check and Air Tight Membrane

Airsealing works at the 24 Bedroom Ward extension @ Croom Hospital for Clancy Construction

Materials: Siga Majrex

Status: Ongoing


Recent Radon Barrier Installations

Selection of radon barriers recently installed in Ardnacrusha and Crusheen in Limerick

Materials: RMB400 & Duraskrim Reinforced Radon Barrier

Status: Complete