Ongoing Radon Barrier Works @ Shannon Hangar Project

Client: L&M Keating

Project: Shannon Hangar Project

Status: Ongoing

Materials: Recently installed RMB400 reinforced radon barrier ref Shannon Hangar project

Comments: Recently installed RMB400 ref above site and as per picture one can clearly see the high durability of the RMB400 which is suitable when encountering a level off continuous traffic during period of structural works

 

 

Blower Door Testing Air Matters

Blower Door Airtight Test

Very successful result achieved by AirMatters after completing a recent Blower Door Airtight Test @ Clondrohid NS, of course this was due to the high standard of work carried out by Southwest Radon when installing a Siga System Vapour Check and Air Tight Membrane – “Well done lads another airtight proof building along with another very satisfied client”

Duct Testing Air Matters